Single-phase short-circuiting device for the third rail of the subway

.


SKU: Msp - CM - 120/1,5 - S3/ps
Category:

Application: from the ground, by positioning the phase clamp on the third rail, followed by the tightening of the clamp on it. The phase clamp must be handled using an insulating stick corresponding to the voltage of the installation.

Components:

  • Special clamp for the third rail – 1 piece
  • Earthing cable – 1 piece
  • Earthing clamp for the connection to the rail (CLPS) – 1 piece
  • Bayonet-hook adaptor (AF E-K) – 1 piece

Packing: waterproof bag.

Related products:
– Multipurpose modular insulating stick type PMU 20-1 B/ba / PMU 20-1 B/baS

Technical characteristics: see the table above (last column – Subway)

Technical characteristics

Value

Earthing cable cross-section Sp  (mm2)

120

Nominal short-circuit current for t = 1s Isc (kA)

30

Shock (peak) nominal current for t = 0,02 s Isd (kA)

60

Test short-circuit current for t = 1s (kA)

34,5

Test shock (peak) current for t = 0,02 s (kA)

69

Power factor (according to SR EN 61230)

2

Earthing cable length (m)

1,5

Diameter of the conductor where the phase clamp can be applied

40, 49, 60, R65

Type of rails

 40 type

Components:

  • Special clamp for the third rail – 1 piece
  • Earthing cable – 1 piece
  • Manual clamp for the connection to the rail (CLPS) – 1 piece
  • Bayonet-hook adapter (AF E-K) – 1 piece